At a glance
- How often does an HMO need an EICR?
- Who do I have to give the report to, and by when?
- What do C1, C2, C3 and FI mean on the report?
- What happens if the report is unsatisfactory?
- Does the council need an EICR for my HMO licence?
How often does an HMO need an EICR?
In England, private landlords must have the fixed electrical installation inspected and tested at least every 5 years by a qualified and competent person. This covers HMOs as well as single lets.
The test is carried out against the 18th edition of the Wiring Regulations (BS 7671). If the electrician recommends a shorter interval on the report, you must follow that shorter interval instead.
Source: Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 (opens in a new tab) · GOV.UK: electrical safety standards guidance (opens in a new tab)
Who gets a copy, and by when
You must give a copy of the report to each existing tenant within 28 days of the inspection, and to a new tenant before they move in.
If the council asks for a copy in writing, you must send it within 7 days. Keep a copy to give to the person carrying out the next inspection.
What the codes on the report mean
C1 means danger is present and needs immediate action. C2 means the installation is potentially dangerous. FI means further investigation is needed without delay. Any C1, C2 or FI makes the report unsatisfactory.
C3 means an improvement is recommended. A C3 on its own does not make the report unsatisfactory, but it is worth planning the work, because councils and insurers do read it.
Source: GOV.UK: electrical safety standards guidance (opens in a new tab)
If the report is unsatisfactory
You must complete the repairs or further investigation within 28 days, or sooner if the report says so. Then get written confirmation from an electrician that the work is done. Give it to each tenant and to the council within 28 days of the work finishing.
Councils can issue a civil penalty for each breach of these rules. We book the repairs with the same electrician where possible, so you get one finished certificate rather than two separate jobs.
Source: Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 (opens in a new tab) · GOV.UK: electrical safety standards guidance (opens in a new tab)
EICRs and London HMO licences
Most London councils ask for a current, satisfactory EICR with an HMO licence application, and some licence conditions require you to produce one on request during the licence. Requirements differ by council, so ask us to check yours before you apply.
We file the report with the rest of your licence evidence so it is ready when the council asks.
Source: GOV.UK: house in multiple occupation licence (opens in a new tab) · HMO KIT: London borough licensing pages
Frequently asked questions
How long is an EICR valid for in an HMO?
Up to 5 years, unless the electrician recommends a shorter interval on the report. If they do, the shorter interval applies.
Is an EICR the same as PAT testing?
No. An EICR covers the fixed wiring, sockets and consumer unit. PAT testing covers portable appliances you supply, such as kettles and microwaves. Many HMO landlords book both in one visit.
What if my EICR has a C2 code?
The report is unsatisfactory. Have the work done within 28 days, or sooner if the report says so. Then send written confirmation to your tenants and the council within 28 days of the work finishing.
Do I need a new EICR to apply for an HMO licence?
Not always a new one, but most London councils want a current, satisfactory report. If yours is close to its 5-year date or shows C1, C2 or FI codes, renew it before you apply.
Next step
Tell us the property address and your current report date, and we will confirm whether you need a new HMO EICR and book the test.
Last updated: